Content
... ... @@ -2,7 +2,7 @@
2 2  
3 3  Though a pre-construction site-visit may seem like a wasted expense, by communicating expectations and requirements to the electrical contractor prior to startup you are actually able to save time and headache on-site. For large jobs especially, taking the time to ensure a proper installation will save hours or days during startup. Any time spent by a technician on-site tracking down serial numbers or troubleshooting/correcting a poor installation is a waste that could have been avoided with good communication and instruction prior to and throughout the installation process.
4 4  
5 -Covering these important topics with the electrical contractor during the pre-construction phase is critical to smooth SHOWRUNNER™ startups.
5 +Covering these important topics with the electrical contractor during the pre-construction phase is critical to smooth ShowRunnerCLC™ startups.
6 6  
7 7  Pre-construction topics to cover:
8 8  
... ... @@ -9,19 +9,22 @@
9 9  * [[Wiring and Installation>>doc:SHOWRUNNER™ Setup Guide.Wiring Guide.WebHome]]
10 10  ** Do not power up panels until installation is complete and wiring is verified safe to connect
11 11  ** [[Cresnet wiring>>doc:SHOWRUNNER™ Setup Guide.Wiring Guide.Wiring Overview.Cresnet.WebHome]] (for jobs with Cresnet)
12 -*** **Do** check for shorts before landing at the panel
13 -*** **Do** land the shield with COM at the panel
14 -*** **Do** splice through and insulate shield in the field
15 -*** **Do** use wire nuts for Cresnet splices
16 -*** **Do not** use lever-nuts for Cresnet splices
17 -*** **Do not** leave copper showing at terminations
18 -*** **Do not** excessively strip back the teal-yellow jacket
12 +*** (% style="color:green" %)**DO**(%%) check for shorts before landing at the panel
13 +*** (% style="color:green" %)**DO**(%%) land the shield with COM at the panel
14 +*** (% style="color:green" %)**DO**(%%) splice through and insulate shield in the field
15 +*** (% style="color:green" %)**DO**(%%) use wire nuts for Cresnet splices
16 +*** (% style="color:red" %)**DO NOT**(%%) use lever-nuts for Cresnet splices
17 +*** (% style="color:red" %)**DO NOT**(%%) leave copper showing at terminations
18 +*** (% style="color:red" %)**DO NOT**(%%) excessively strip back the teal-yellow jacket
19 19  ** [[Ethernet terminations>>doc:SHOWRUNNER™ Setup Guide.Wiring Guide.Wiring Overview.Ethernet.WebHome]] (where the EC is terminating the Ethernet)
20 -*** **Do** use T568B Pin-Out
21 -*** **Do not** exceed 100m/328' cable length
20 +*** (% style="color:green" %)**DO**(%%) use T568B Pin-Out
21 +*** (% style="color:red" %)**DO NOT**(%%) use EZ-style passthrough RJ-45 terminations
22 +*** (% style="color:red" %)**DO NOT**(%%) exceed 100m/328' cable length
22 22  ** [[Zūm Wired wiring>>doc:SHOWRUNNER™ Setup Guide.Wiring Guide.Wiring Overview.Zūm Net.WebHome]] (for Zūm Wired jobs)
23 -*** **Do** follow the same rules as Ethernet for both Zūm Net and Zūm Link terminations/cable length
24 -*** **Do not** mix up Zūm Net and Zūm Link cables
24 +*** (% style="color:green" %)**DO**(%%) use T568B Pin-Out
25 +*** (% style="color:red" %)**DO NOT**(%%) use EZ-style passthrough RJ-45 terminations
26 +*** (% style="color:red" %)**DO NOT**(%%) exceed 100m/328' cable length
27 +*** (% style="color:red" %)**DO NOT**(%%) mix up Zūm Net and Zūm Link cables
25 25  ** Follow the load schedule
26 26  * Serial number collection
27 27  ** SNs should be collected for all networked devices (all Cresnet devices and Zūm Wired devices)