... ... @@ -2,7 +2,7 @@
2 2  
3 3  Though a pre-construction site-visit may seem like a wasted expense, by communicating expectations and requirements to the electrical contractor prior to startup you are actually able to save time and headache on-site. For large jobs especially, taking the time to ensure a proper installation will save hours or days during startup. Any time spent by a technician on-site tracking down serial numbers or troubleshooting/correcting a poor installation is a waste that could have been avoided with good communication and instruction prior to and throughout the installation process.
4 4  
5 -Covering these important topics with the electrical contractor during the pre-construction phase is critical to smooth SHOWRUNNER™ startups.
5 +Covering these important topics with the electrical contractor during the pre-construction phase is critical to smooth ShowRunnerCLC™ startups.
6 6  
7 7  Pre-construction topics to cover:
8 8  
... ... @@ -12,14 +12,18 @@
12 12  *** **Do** check for shorts before landing at the panel
13 13  *** **Do** land the shield with COM at the panel
14 14  *** **Do** splice through and insulate shield in the field
15 +*** **Do** use wire nuts for Cresnet splices
16 +*** **Do not** use lever-nuts for Cresnet splices
15 15  *** **Do not** leave copper showing at terminations
16 -*** **Do not** use lever-nuts (**do** use wire nuts)
17 17  *** **Do not** excessively strip back the teal-yellow jacket
18 18  ** [[Ethernet terminations>>doc:SHOWRUNNER™ Setup Guide.Wiring Guide.Wiring Overview.Ethernet.WebHome]] (where the EC is terminating the Ethernet)
19 19  *** **Do** use T568B Pin-Out
21 +*** **Do not** use EZ-style passthrough RJ-45 terminations
20 20  *** **Do not** exceed 100m/328' cable length
21 21  ** [[Zūm Wired wiring>>doc:SHOWRUNNER™ Setup Guide.Wiring Guide.Wiring Overview.Zūm Net.WebHome]] (for Zūm Wired jobs)
22 -*** **Do** follow the same rules as Ethernet for both Zūm Net and Zūm Link terminations/cable length
24 +*** **Do** use T568B Pin-Out
25 +*** **Do not** use EZ-style passthrough RJ-45 terminations
26 +*** **Do not** exceed 100m/328' cable length
23 23  *** **Do not** mix up Zūm Net and Zūm Link cables
24 24  ** Follow the load schedule
25 25  * Serial number collection