Changes for page Pre-Construction Checklist
Last modified by Alexander Mott on 2024/01/05 19:12
From version 4.1
edited by Alexander Mott
on 2022/06/22 20:04
on 2022/06/22 20:04
Change comment:
There is no comment for this version
To version 9.1
edited by Alexander Mott
on 2023/04/21 19:12
on 2023/04/21 19:12
Change comment:
There is no comment for this version
Summary
-
Page properties (1 modified, 0 added, 0 removed)
Details
- Page properties
-
- Content
-
... ... @@ -2,25 +2,29 @@ 2 2 3 3 Though a pre-construction site-visit may seem like a wasted expense, by communicating expectations and requirements to the electrical contractor prior to startup you are actually able to save time and headache on-site. For large jobs especially, taking the time to ensure a proper installation will save hours or days during startup. Any time spent by a technician on-site tracking down serial numbers or troubleshooting/correcting a poor installation is a waste that could have been avoided with good communication and instruction prior to and throughout the installation process. 4 4 5 -Covering these important topics with the electrical contractor during the pre-construction phase is critical to smooth S HOWRUNNER™ startups.5 +Covering these important topics with the electrical contractor during the pre-construction phase is critical to smooth ShowRunnerCLC™ startups. 6 6 7 - Importanttopics to coverwith the electrical contractor prior to startup:7 +Pre-construction topics to cover: 8 8 9 9 * [[Wiring and Installation>>doc:SHOWRUNNER™ Setup Guide.Wiring Guide.WebHome]] 10 10 ** Do not power up panels until installation is complete and wiring is verified safe to connect 11 11 ** [[Cresnet wiring>>doc:SHOWRUNNER™ Setup Guide.Wiring Guide.Wiring Overview.Cresnet.WebHome]] (for jobs with Cresnet) 12 -*** **Do** check for shorts before landing at the panel 13 -*** **Do** land the shield with COM at the panel 14 -*** **Do** splice through and insulate shield in the field 15 -*** **Do not** leave copper showing at terminations 16 -*** **Do not** use lever-nuts (**do** use wire nuts) 17 -*** **Do not** excessively strip back the teal-yellow jacket 12 +*** (% style="color:green" %)**DO**(%%) check for shorts before landing at the panel 13 +*** (% style="color:green" %)**DO**(%%) land the shield with COM at the panel 14 +*** (% style="color:green" %)**DO**(%%) splice through and insulate shield in the field 15 +*** (% style="color:green" %)**DO**(%%) use wire nuts for Cresnet splices 16 +*** (% style="color:red" %)**DO NOT**(%%) use lever-nuts for Cresnet splices 17 +*** (% style="color:red" %)**DO NOT**(%%) leave copper showing at terminations 18 +*** (% style="color:red" %)**DO NOT**(%%) excessively strip back the teal-yellow jacket 18 18 ** [[Ethernet terminations>>doc:SHOWRUNNER™ Setup Guide.Wiring Guide.Wiring Overview.Ethernet.WebHome]] (where the EC is terminating the Ethernet) 19 -*** **Do** use T568B Pin-Out 20 -*** **Do not** exceed 100m/328' cable length 20 +*** (% style="color:green" %)**DO**(%%) use T568B Pin-Out 21 +*** (% style="color:red" %)**DO NOT**(%%) use EZ-style passthrough RJ-45 terminations 22 +*** (% style="color:red" %)**DO NOT**(%%) exceed 100m/328' cable length 21 21 ** [[Zūm Wired wiring>>doc:SHOWRUNNER™ Setup Guide.Wiring Guide.Wiring Overview.Zūm Net.WebHome]] (for Zūm Wired jobs) 22 -*** **Do** follow the same rules as Ethernet for both Zūm Net and Zūm Link terminations/cable length 23 -*** **Do not** mix up Zūm Net and Zūm Link cables 24 +*** (% style="color:green" %)**DO**(%%) use T568B Pin-Out 25 +*** (% style="color:red" %)**DO NOT**(%%) use EZ-style passthrough RJ-45 terminations 26 +*** (% style="color:red" %)**DO NOT**(%%) exceed 100m/328' cable length 27 +*** (% style="color:red" %)**DO NOT**(%%) mix up Zūm Net and Zūm Link cables 24 24 ** Follow the load schedule 25 25 * Serial number collection 26 26 ** SNs should be collected for all networked devices (all Cresnet devices and Zūm Wired devices)