5 5  Covering these important topics with the electrical contractor during the pre-construction phase is critical to smooth SHOWRUNNER™ startups.
6 6  
7 -Important topics to cover with the electrical contractor prior to startup:
7 +Pre-construction topics to cover:
8 8  
9 9  * [[Wiring and Installation>>doc:SHOWRUNNER™ Setup Guide.Wiring Guide.WebHome]]
10 10  ** Do not power up panels until installation is complete and wiring is verified safe to connect