1 -The foundations of a quick, easy, and trouble-free startup are laid before construction even begins. Meeting with the electrical contractor prior to construction is important to establish a good working relationship, explain the requirements for a Crestron lighting control installation, and to exchange contact information so that any technical questions or concerns can be addressed prior to startup.
1 +The foundations of a quick, easy, and trouble-free startup are laid before the control hardware even arrives onsite. Meeting with the electrical contractor prior to construction is important to establish a good working relationship, explain the requirements for a Crestron lighting control installation, and to exchange contact information so that any technical questions or concerns can be addressed prior to startup.
2 2  
3 3  Though a pre-construction site-visit may seem like a wasted expense, by communicating expectations and requirements to the electrical contractor prior to startup you are actually able to save time and headache on-site. For large jobs especially, taking the time to ensure a proper installation will save hours or days during startup. Any time spent by a technician on-site tracking down serial numbers or troubleshooting/correcting a poor installation is a waste that could have been avoided with good communication and instruction prior to and throughout the installation process.
4 4  
5 -Important topics to cover with the electrical contractor prior to startup:
5 +Covering these important topics with the electrical contractor during the pre-construction phase is critical to smooth SHOWRUNNER™ startups.
6 6  
7 +Pre-construction topics to cover:
8 +
7 7  * [[Wiring and Installation>>doc:SHOWRUNNER™ Setup Guide.Wiring Guide.WebHome]]
8 8  ** Do not power up panels until installation is complete and wiring is verified safe to connect
9 9  ** [[Cresnet wiring>>doc:SHOWRUNNER™ Setup Guide.Wiring Guide.Wiring Overview.Cresnet.WebHome]] (for jobs with Cresnet)
... ... @@ -10,8 +10,9 @@
10 10  *** **Do** check for shorts before landing at the panel
11 11  *** **Do** land the shield with COM at the panel
12 12  *** **Do** splice through and insulate shield in the field
15 +*** **Do** use wire nuts for Cresnet splices
16 +*** **Do not** use lever-nuts for Cresnet splices
13 13  *** **Do not** leave copper showing at terminations
14 -*** **Do not** use lever-nuts (**do** use wire nuts)
15 15  *** **Do not** excessively strip back the teal-yellow jacket
16 16  ** [[Ethernet terminations>>doc:SHOWRUNNER™ Setup Guide.Wiring Guide.Wiring Overview.Ethernet.WebHome]] (where the EC is terminating the Ethernet)