Change comment:
There is no comment for this version
Summary
-
Page properties (1 modified, 0 added, 0 removed)
Details
- Page properties
-
- Content
-
... ... @@ -6,7 +6,7 @@ 6 6 7 7 Pre-construction topics to cover: 8 8 9 -* [[Wiring and Installation>>doc:SHOWRUNNER™ Setup Guide.Wiring Guide.WebHome]]9 +* Wiring and Installation 10 10 ** Do not power up panels until installation is complete and wiring is verified safe to connect 11 11 ** [[Cresnet wiring>>doc:SHOWRUNNER™ Setup Guide.Troubleshooting Guide.Troubleshooting.Cresnet Wiring Overview.WebHome]] (for jobs with Cresnet) 12 12 *** (% style="color:green" %)**DO**(%%) check for shorts before landing at the panel