Last modified by Alexander Mott on 2024/01/05 19:12

From version 17.1
edited by Alexander Mott
on 2024/01/05 18:55
Change comment: Renamed back-links.
To version 1.1
edited by Alexander Mott
on 2022/06/22 18:24
Change comment: There is no comment for this version

Summary

Details

Page properties
Title
... ... @@ -1,1 +1,1 @@
1 -Pre-Construction Checklist
1 +Pre-Construction
Content
... ... @@ -1,39 +1,30 @@
1 -The foundations of a quick, easy, and trouble-free startup are laid before the control hardware even arrives onsite. Meeting with the electrical contractor prior to construction is important to establish a good working relationship, explain the requirements for a Crestron lighting control installation, and to exchange contact information so that any technical questions or concerns can be addressed prior to startup.
1 +The foundations of a quick, easy, and trouble-free startup are laid before construction even begins. Meeting with the electrical contractor prior to construction is important to establish a good working relationship, explain the requirements for a Crestron lighting control installation, and to exchange contact information so that any technical questions or concerns can be addressed prior to startup.
2 2  
3 3  Though a pre-construction site-visit may seem like a wasted expense, by communicating expectations and requirements to the electrical contractor prior to startup you are actually able to save time and headache on-site. For large jobs especially, taking the time to ensure a proper installation will save hours or days during startup. Any time spent by a technician on-site tracking down serial numbers or troubleshooting/correcting a poor installation is a waste that could have been avoided with good communication and instruction prior to and throughout the installation process.
4 4  
5 -Covering these important topics with the electrical contractor during the pre-construction phase is critical to smooth ShowRunnerCLC™ startups.
5 +Important topics to cover with the electrical contractor prior to startup:
6 6  
7 -Pre-construction topics to cover:
8 -
9 9  * [[Wiring and Installation>>doc:SHOWRUNNER™ Setup Guide.Wiring Guide.WebHome]]
10 10  ** Do not power up panels until installation is complete and wiring is verified safe to connect
11 11  ** [[Cresnet wiring>>doc:SHOWRUNNER™ Setup Guide.Wiring Guide.Wiring Overview.Cresnet.WebHome]] (for jobs with Cresnet)
12 -*** (% style="color:green" %)**DO**(%%) check for shorts before landing at the panel
13 -*** (% style="color:green" %)**DO**(%%) land the shield with COM at the panel
14 -*** (% style="color:green" %)**DO**(%%) splice through and insulate shield in the field
15 -*** (% style="color:green" %)**DO**(%%) use wire nuts for Cresnet splices
16 -*** (% style="color:red" %)**DO NOT**(%%) use lever-nuts for Cresnet splices
17 -*** (% style="color:red" %)**DO NOT**(%%) leave copper showing at terminations
18 -*** (% style="color:red" %)**DO NOT**(%%) excessively strip back the teal-yellow jacket
19 -** [[Ethernet terminations>>doc:SHOWRUNNER™ Setup Guide.Troubleshooting Guide.Troubleshooting.Ethernet Wiring Overview.WebHome]] (where the EC is terminating the Ethernet)
20 -*** (% style="color:green" %)**DO**(%%) use standard, non-passthrough RJ-45 connectors
21 -*** (% style="color:green" %)**DO**(%%) use T568B Pin-Out
22 -*** (% style="color:red" %)**DO NOT**(%%) use EZ-style passthrough RJ-45 connectors
23 -*** (% style="color:red" %)**DO NOT**(%%) exceed 100m/328' cable length
24 -** [[Zūm Wired wiring>>doc:SHOWRUNNER™ Setup Guide.Troubleshooting Guide.Hardware and Installation.Zūm Wired Wiring Overview.WebHome]] (for Zūm Wired jobs)
25 -*** (% style="color:green" %)**DO**(%%) use standard, non-passthrough RJ-45 connectors
26 -*** (% style="color:green" %)**DO**(%%) use T568B Pin-Out
27 -*** (% style="color:red" %)**DO NOT**(%%) use EZ-style passthrough RJ-45 connectors
28 -*** (% style="color:red" %)**DO NOT**(%%) exceed 100m/328' cable length
29 -*** (% style="color:red" %)**DO NOT**(%%) mix up Zūm Net and Zūm Link cables
10 +*** **Do** check for shorts before landing at the panel
11 +*** **Do** land the shield with COM at the panel
12 +*** **Do** splice through and insulate shield in the field
13 +*** **Do not** leave copper showing at terminations
14 +*** **Do not** use lever-nuts (**do** use wire nuts)
15 +*** **Do not** excessively strip back the teal-yellow jacket
16 +** [[Ethernet terminations>>doc:SHOWRUNNER™ Setup Guide.Wiring Guide.Wiring Overview.Ethernet.WebHome]] (where the EC is terminating the Ethernet)
17 +*** **Do** use T568B Pin-Out
18 +*** **Do not** exceed 100m/328' cable length
19 +** [[Zūm Wired wiring>>doc:SHOWRUNNER™ Setup Guide.Wiring Guide.Wiring Overview.Zūm Net.WebHome]] (for Zūm Wired jobs)
20 +*** **Do** follow the same rules as Ethernet for both Zūm Net and Zūm Link terminations/cable length
21 +*** **Do not** mix up Zūm Net and Zūm Link cables
30 30  ** Follow the load schedule
31 31  * Serial number collection
32 32  ** SNs should be collected for all networked devices (all Cresnet devices and Zūm Wired devices)
33 -*** If possible, SNs should be provided prior to startup. This way they can be put into the configuration prior to arriving on-site
34 34  ** The EC does not need to collect SNs for non-system devices (e.g. Crestron NS occupancy sensors, Steinel occupancy sensors, LDL photocells, and GLPPA-KP keypads
35 35  ** It is important to not just have a list of SNs on-site, but to be able to associate individual SNs with specific installed devices
36 36  ** The easiest way to do this is to write the SNs of installed devices on the floor plans or riser diagram as they are installed
37 37  * MAC address collection (optional)
38 38  ** Collecting MAC addresses is redundant if serial numbers are provided
39 -* Establish expectations for what "ready to commission" means by sharing the [[site readiness checklist>>doc:SHOWRUNNER™ Setup Guide.SHOWRUNNER™ Installation Guide.Preparation.Site Readiness Checklist.WebHome]]
30 +* Establish expectations for what "ready to commission" means by sharing the [[site readiness checklist>>doc:SHOWRUNNER™ Setup Guide.SHOWRUNNER™ Installation Guide.Site Readiness Checklist.WebHome]]