Changes for page Pre-Construction Checklist
Last modified by Alexander Mott on 2024/01/05 19:12
To version 8.1
edited by Alexander Mott
on 2023/04/21 16:41
on 2023/04/21 16:41
Change comment:
There is no comment for this version
Summary
-
Page properties (2 modified, 0 added, 0 removed)
Details
- Page properties
-
- Title
-
... ... @@ -1,1 +1,1 @@ 1 -Pre-Construction Checklist1 +Pre-Construction - Content
-
... ... @@ -9,24 +9,22 @@ 9 9 * [[Wiring and Installation>>doc:SHOWRUNNER™ Setup Guide.Wiring Guide.WebHome]] 10 10 ** Do not power up panels until installation is complete and wiring is verified safe to connect 11 11 ** [[Cresnet wiring>>doc:SHOWRUNNER™ Setup Guide.Wiring Guide.Wiring Overview.Cresnet.WebHome]] (for jobs with Cresnet) 12 -*** (% style="color:green" %)**DO**(%%) check for shorts before landing at the panel 13 -*** (% style="color:green" %)**DO**(%%) land the shield with COM at the panel 14 -*** (% style="color:green" %)**DO**(%%) splice through and insulate shield in the field 15 -*** (% style="color:green" %)**DO**(%%) use wire nuts for Cresnet splices 16 -*** (% style="color:red" %)**DO NOT**(%%) use lever-nuts for Cresnet splices 17 -*** (% style="color:red" %)**DO NOT**(%%) leave copper showing at terminations 18 -*** (% style="color:red" %)**DO NOT**(%%) excessively strip back the teal-yellow jacket 19 -** [[Ethernet terminations>>doc:SHOWRUNNER™ Setup Guide.Troubleshooting Guide.Hardware and Installation.Ethernet Wiring Overview.WebHome]] (where the EC is terminating the Ethernet) 20 -*** (% style="color:green" %)**DO**(%%) use standard, non-passthrough RJ-45 connectors 21 -*** (% style="color:green" %)**DO**(%%) use T568B Pin-Out 22 -*** (% style="color:red" %)**DO NOT**(%%) use EZ-style passthrough RJ-45 connectors 23 -*** (% style="color:red" %)**DO NOT**(%%) exceed 100m/328' cable length 24 -** [[Zūm Wired wiring>>doc:SHOWRUNNER™ Setup Guide.Troubleshooting Guide.Hardware and Installation.Zūm Wired Wiring Overview.WebHome]] (for Zūm Wired jobs) 25 -*** (% style="color:green" %)**DO**(%%) use standard, non-passthrough RJ-45 connectors 26 -*** (% style="color:green" %)**DO**(%%) use T568B Pin-Out 27 -*** (% style="color:red" %)**DO NOT**(%%) use EZ-style passthrough RJ-45 connectors 28 -*** (% style="color:red" %)**DO NOT**(%%) exceed 100m/328' cable length 29 -*** (% style="color:red" %)**DO NOT**(%%) mix up Zūm Net and Zūm Link cables 12 +*** **Do** check for shorts before landing at the panel 13 +*** **Do** land the shield with COM at the panel 14 +*** **Do** splice through and insulate shield in the field 15 +*** **Do** use wire nuts for Cresnet splices 16 +*** **Do not** use lever-nuts for Cresnet splices 17 +*** **Do not** leave copper showing at terminations 18 +*** **Do not** excessively strip back the teal-yellow jacket 19 +** [[Ethernet terminations>>doc:SHOWRUNNER™ Setup Guide.Wiring Guide.Wiring Overview.Ethernet.WebHome]] (where the EC is terminating the Ethernet) 20 +*** **Do** use T568B Pin-Out 21 +*** **Do not** use EZ-style passthrough RJ-45 terminations 22 +*** **Do not** exceed 100m/328' cable length 23 +** [[Zūm Wired wiring>>doc:SHOWRUNNER™ Setup Guide.Wiring Guide.Wiring Overview.Zūm Net.WebHome]] (for Zūm Wired jobs) 24 +*** **Do** use T568B Pin-Out 25 +*** **Do not** use EZ-style passthrough RJ-45 terminations 26 +*** **Do not** exceed 100m/328' cable length 27 +*** **Do not** mix up Zūm Net and Zūm Link cables 30 30 ** Follow the load schedule 31 31 * Serial number collection 32 32 ** SNs should be collected for all networked devices (all Cresnet devices and Zūm Wired devices)