Changes for page Pre-Construction Checklist
Last modified by Alexander Mott on 2024/01/05 19:12
From version 1.1
edited by Alexander Mott
on 2022/06/22 18:24
on 2022/06/22 18:24
Change comment:
There is no comment for this version
To version 2.1
edited by Alexander Mott
on 2022/06/22 19:58
on 2022/06/22 19:58
Change comment:
There is no comment for this version
Summary
-
Page properties (1 modified, 0 added, 0 removed)
Details
- Page properties
-
- Content
-
... ... @@ -22,6 +22,7 @@ 22 22 ** Follow the load schedule 23 23 * Serial number collection 24 24 ** SNs should be collected for all networked devices (all Cresnet devices and Zūm Wired devices) 25 +*** If possible, SNs should be provided prior to startup. This way they can be put into the configuration prior to arriving on-site 25 25 ** The EC does not need to collect SNs for non-system devices (e.g. Crestron NS occupancy sensors, Steinel occupancy sensors, LDL photocells, and GLPPA-KP keypads 26 26 ** It is important to not just have a list of SNs on-site, but to be able to associate individual SNs with specific installed devices 27 27 ** The easiest way to do this is to write the SNs of installed devices on the floor plans or riser diagram as they are installed