Changes for page Installation and Configuration Guide for Technicians
Last modified by Scott Kohlmann on 2023/04/20 22:37
From version 12.1
edited by Mark Kohlmann
on 2022/04/15 15:23
on 2022/04/15 15:23
Change comment:
There is no comment for this version
To version 6.1
edited by Scott Kohlmann
on 2021/12/21 00:27
on 2021/12/21 00:27
Change comment:
There is no comment for this version
Summary
-
Page properties (2 modified, 0 added, 0 removed)
Details
- Page properties
-
- Author
-
... ... @@ -1,1 +1,1 @@ 1 -XWiki. mark\.kohlmann@chiefintegrations\.com1 +XWiki.scott\.kohlmann@chiefintegrations\.com - Content
-
... ... @@ -1,11 +9,3 @@ 1 -(% class="box warningmessage" %) 2 -((( 3 -showrunner is tested against current Crestron firmware releases. Please use at least the recommended firmware builds. 4 -3-Series: PUF 1.8001.0146 5 -4-Series: PUF 2.7000.00052.01 6 -VC-4: 2.7000.00047 7 -))) 8 - 9 9 === Notes === 10 10 11 11 Static IP or properly setup DHCP/DNS implementation required. ... ... @@ -29,15 +29,6 @@ 29 29 30 30 * Obtain the latest build of ShowRunner [[https:~~/~~/files.chiefintegrations.com/s/WHNzXrrZbB5jC3E>>url:https://files.chiefintegrations.com/s/WHNzXrrZbB5jC3E]] 31 31 * Set the processor’s IP Address per your network requirements 32 -* For processors with a Control Subnet (CP3N/AV3/PRO3/CP4N/AV4/PRO4/ZUM-HUB4): 33 -** Connect to the processor via Text Console and type "startprogafterrouter on" 34 -*** This will force the processor to wait until the router has started before attempting to load the showrunner™ program, avoiding potential license validation issues after a power loss. 35 -** Networked lighting hardware should be landed on the Control Subnet 36 -** The processor acts as a DHCP server on the Control Subnet, with addresses that are determined automatically based on the LAN configuration 37 -** The Control Subnet can be configured manually in the "Functions>Ethernet Addressing...>Control Subnet" menu of Toolbox 38 -*** Set routing to "Manual" with the start address and subnet size 39 -*** E.g., a setting of "10.0.0.0/24" will have the processor at 10.0.0.1 with an IP mask of 255.255.255.0 and a default gateway and DNS server at 10.0.0.2 40 -*** 100.64.0.0/10 is a recommended range as it is unlikely to be used on any corporate network. Processor IP will be 100.64.0.1 and default gateway/DNS will be 100.64.0.2. Console command is: ##csrouterprefix 100.64.0.0/10## 41 41 * Connect your computer to the same network as the processor. Make sure your computer’s IP settings are compatible with the lighting hardware. 42 42 * Double click the PUF to install ShowRunner (works best with Toolbox closed) 43 43 * Select the PUF file again if needed, connect to the processor using the pencil, and select Recheck (This verifies the need to install the program, the XPanel UI, and the Crestron App UI) ... ... @@ -51,7 +51,6 @@ 51 51 52 52 * Download the configuration file from the link provided by Chief Integrations 53 53 * Obtain and download the license from [[https:~~/~~/portal.chiefintegrations.com>>url:https://portal.chiefintegrations.com]] 54 -** Processors with a Control Subnet should use the LAN MAC address, **not** the Control Subnet MAC address 55 55 * Navigate to the showrunner™ management page 56 56 * Login to the showrunnerHUB™ 57 57 ** 4-Series processor: The login created by the processor will work ... ... @@ -62,23 +62,16 @@ 62 62 *** Leave restart unchecked after transfer 63 63 *** Select “Choose File” find the license file you downloaded from the portal 64 64 *** Select “Upload” 65 -** Loading Configuration 66 -*** From Configuration File 67 -**** Under “Upload New Config File” 68 -***** Select “Choose File” and find the provided SrConfig.json for this processor from the project link that was sent at project delivery. 69 -***** Select “Upload” 70 -***** Alternatively, you can drop the License.lic using Toolbox’s File Manager or your SFTP client into the NVRAM/sr folder of the processor, the SrConfig.json into NVRAM/sr/default and perform “progreset” from the processor’s console 71 -***** The program will restart 72 -*** From Backup 73 -**** Select "Restore" 74 -**** Select "Choose Backup" and find the "SRBackup.zip" of the backup you wish to restore 75 -**** Enter the secret used to create the backup. Showrunner will upload the file and verify the secret. 76 -**** Select "Restart" to load the new configuration 47 +** Under “Upload New Config File” 48 +*** Select “Choose File” and find the provided SrConfig.json for this processor from the project link that was sent at project delivery. 49 +*** Select “Upload” 50 +*** Alternatively, you can drop the License.lic using Toolbox’s File Manager or your SFTP client into the NVRAM/sr folder of the processor, the SrConfig.json into NVRAM/sr/default and perform “progreset” from the processor’s console 51 +*** The program will restart 77 77 * Wait about 45 seconds after loading the configuration for the program to restart completely 78 78 79 79 === TSW Setup (Per Panel) === 80 80 81 -* Set the TS /TSWs IP Address per your network requirements (If using a panel other than TSW-770 you will need the CI_ShowRunner-UI_v3.xx PUF)56 +* Set the TSW 770's IP Address per your network requirements (If using a panel other than TSW-770 you will need the CI_ShowRunner-UI_v3.xx PUF) 82 82 * Connect the PUF (CI_ShowRunner_v3.xx) to the TSW to load the UI 83 83 ** Only add CI_ShowRunner-UI_v3.xx if using touch panel other than TSW-770. 84 84 * When finished, connect to the TSW with Text Console and type “addm 10 x.x.x.x” to link the panel to the processor (where x.x.x.x is the processor’s IP or hostname [DHCP/DNS])