Summary

Details

Page properties
Hidden
... ... @@ -1,1 +1,1 @@
1 -false
1 +true
Content
... ... @@ -18,6 +18,12 @@
18 18  See //[[Figure 1>>WebHome||anchor="HFigure1"]]// for details.
19 19  See //[[Figure 2>>WebHome||anchor="HFigure2"]]// for details.
20 20  
21 += Zūm Discovery =
22 +
23 +SHOWRUNNER™ includes a Zum Wired Discovery feature that makes it easy to import Zūm Rooms that have been configured in App Mode into an existing SHOWRUNNER™ configuration. The process for starting up a system using this method is the same as starting up any other networked installation in App Mode, but with the added steps of installing SHOWRUNNER and importing the Zum Rooms
24 +
25 += SHOWRUNNER™ Complete Control =
26 +
21 21  = Start-Up Guide =
22 22  
23 23  Lorem
... ... @@ -24,12 +24,15 @@
24 24  
25 25  (% class="box warningmessage" %)
26 26  (((
27 -Basic steps:
33 +cross reference/update to old [[zumnet startup>>doc:SHOWRUNNER™ Setup Guide.SHOWRUNNER™ Installation Guide.SHOWRUNNER™ Installation and Network Setup.ZUMNET-JBOX Setup.WebHome]]?
28 28  
35 +basic steps:
36 +
29 29  * configure your processor per chief's startup guide
30 30  * get all zumnet jbox online
31 31  ** use built in dhcp from processor control subnet
32 -** if using proc without control subnet, use showrunner [[dhcp>>https://wiki.chiefintegrations.com/SHOWRUNNER%E2%84%A2%20Setup%20Guide/Troubleshooting%20Guide/Advanced%20Tools/DHCP%20Server/]]
40 +** if using proc without control subnet, use showrunner [[dhcp>>doc:SHOWRUNNER™ Setup Guide.Troubleshooting Guide.Advanced Tools.DHCP Server.WebHome]]
41 +** (**will probably need a lot of extra steps + alterations to how we make configs since static IPs require a lot more information as well as corresponding modifications to SrConfig.json**)
33 33  * use crestron toolbox device discovery to create a [[Device Summary>>doc:SHOWRUNNER™ Setup Guide.SHOWRUNNER™ Installation Guide.Preparation.Toolbox Basics.WebHome||anchor="HExporttoDeviceSummary"]]
34 34  * use chief tools tm tool to generate various zum wired load scripts
35 35  ** (need to determine exact process for this; will need to add IP-ID and new hostname to device summary somehow)
... ... @@ -44,11 +44,28 @@
44 44  ** will take up to several minutes per room, but will be able to do up to 10 rooms simultaneously
45 45  ** devices will reboot, possibly multiple times
46 46  ** check loadscript manager for any failures and re-run script for those devices if necessary (a rebooting zumnet box will temporarily disrupt online status for downstream zumnet jboxs and potentially interrupt the firmware update)
56 +* run device discovery again to confirm that all zumnet boxes were updated
57 +** zumnet boxes update last, so if a zumnet jbox is updated then this means that all of the zumlink devices that were online have also been updated
58 +* if app mode backup is desired, configure the boxes using the app now
47 47  * run "ip config (def. hostname)" loadscript to update device IP-IDs and hostnames
48 48  ** devices will reboot
49 49  ** devices will now have new hostnames, so any further loadscripts should use (new hostname) versions
62 +* run "cnet mode (def. hostname)" loadscript to put devices into CNET mode
63 +** if app mode backup is desired, also run "autoswitch enable (def. hostname)" loadscript
64 +** devices will reboot
50 50  * if using a processor without control subnet, run the "static ip config (new hostname)" script
51 51  ** this loadscript is necessary, as the showrunner DHCP server is only intended for commissioning. It must always be manually started after program restart and should not be used in production
52 52  ** (**will probably need a lot of extra steps + alterations to how we make configs since static IPs require a lot more information as well as corresponding modifications to SrConfig.json**)
68 +* once done, commission job essentially as normal showrunner job
69 +** (**sr commissioning guide is incomplete**)
70 +** connect to each zumnet jbox and address zumlink devices per the takeoff
71 +*** if devices are not online, then troubleshoot why and update firmware through device tree view once they are online
72 +** occ timeouts can be adjusted through UI; other settings (ie reach) should be adjusted through app
73 +** photocells etc are set up through UI
74 +** loads teseted and verified through UI; can be moved around between controllers as necessary
75 +*** loads don't need to be in the same room as the zumnet that controls them
76 +** keypads can use standard SR types or be fully customized
77 +** set up schedule, etc.
78 +* once done, save and back up configuration file
53 53  )))
54 54  )))