Changes for page *Installation Best Practices
Last modified by Alexander Mott on 2023/12/08 18:37
From version 6.1
edited by Alexander Mott
on 2023/03/24 17:50
on 2023/03/24 17:50
Change comment:
There is no comment for this version
To version 5.1
edited by Alexander Mott
on 2023/03/24 17:08
on 2023/03/24 17:08
Change comment:
There is no comment for this version
Summary
-
Page properties (2 modified, 0 added, 0 removed)
Details
- Page properties
-
- Title
-
... ... @@ -1,1 +1,1 @@ 1 -* *Installation Best Practices1 +*Installation Best Practices - Content
-
... ... @@ -6,31 +6,55 @@ 6 6 ((( 7 7 Crestron Zūm Wired is a distributed lighting control platform that utilizes advanced sensors and industry standard dimming protocols to provide automated control of a building's lighting. 8 8 9 - Thisarticleudes somebestpracticesto put in place duringinstallation to ensureasmooth start-upwith minimaltroubleshooting.9 +Zūm Wired lighting controllers use DALI, 0-10V, and phase dimming to control lighting fixtures, with DMX control available by integrating with products from some of Crestron's other product lines. 10 10 11 + 12 + 13 +two different communications protocols, Zūm Net and Zūm Link, in order to provide 14 + 11 11 = Zūm Net and Zūm Link Cabling = 12 12 13 - Communication between Zūm Wired devices is achieved using two different communications protocols, Zūm Net and ZūmLink. Both protocols useCat5e or Cat6 cable with RJ-45 terminations, but the purpose and specifications for each protocol are different and it is important not to mix them up in the field in order to avoid damaging the control hardware or processor.17 +Lorem 14 14 15 - //ZūmNet //is based on the Ethernet standard and is used to provide networked communicationbetween individual ZUMNET-JBOX-* devices andthe processor. Zūm Net uses purple ports on ZUMNET-JBOX-* devices and connectsback to the network switch at the processor panel.19 +== Terminations == 16 16 17 - //ZūmLink// is basedon Crestron's Cresnet communication protocol and is used to connect the primary ZUMNET-JBOX-* room controller to various ZUMLINK-* devices within the room that it controls. Zūm Link uses orange ports on ZUMNET-JBOX-* and ZUMLINK-* devices and is daisy-chained between devices.21 +Lorem 18 18 19 - **Plugging apowered Zūm Link cableinto a Zūm Net or Ethernet port will damagethedevice being plugged in to and may result in the device needing to be replaced.** Always follow these best practices when installing Zūm Wired cabling:23 +== Cable Length == 20 20 21 -* Use different color cable for Zūm Net and Zūm Link. Pre-made cables can be purchased from Crestron, who recommends purple for Zūm Net and orange for Zūm Link 22 -* Always label cables so that it is easy to determine whether it is a Zūm Net or a Zūm Link cable and what device it connects to 23 -* Do not allow runs of Zūm Net cable to exceed 100m or 328' between ZUMNET-JBOX-* devices 24 -* When terminating your own cables, always use standard, non-passthrough RJ-45 connectors. Pass-through RJ-45 connectors are not always compatible with Zūm Net ports and often result in devices that do not report online, report online inconsistently, or have other communication issues 25 +Lorem 25 25 27 +== Cable Color == 28 + 29 +Lorem 30 + 26 26 = Device Installation = 27 27 28 -Zūm Wired lighting controllers are primarily junction-box mounted devices (ZUMNET-JBOX-* and ZUMLINK-JBOX-* models), with only some models (ZUMLINK-EXP-DIMU) being wall-mounted. ZūmWired sensors can be mounted in a variety of ways, using either junction-boxes or mounting directly to the ceiling. Zūm Wired keypads (wall switches) mount using single-gang boxes. See product spec sheets or installation guides for details on how to mount specific devices.33 +Zūm Wired lighting controllers are primarily junction-box mounted devices (ZUMNET-JBOX-* and ZUMLINK-JBOX-* models), with only some models (ZUMLINK-EXP-DIMU) being wall-mounted. 29 29 30 - **Tomakestart-up,troubleshooting,andfuture maintenanceeasier**,alwaysfollow thesebestpracticeswheninstallingZūmWireddevices:35 +Zūm Wired sensors can be mounted in a variety of ways, using either junction-boxes or mounting directly to the ceiling. 31 31 32 -* Record the serial numbers of all ZUMNET-JBOX-* and ZUMLINK-* devices. Zūm Wired hardware must be addressed during start-up, and it is much easier to accomplish this if there is a record of which serial number corresponds to each device 33 -* Install all devices in accessible locations. There are many reasons that it may be necessary to go back to an installed device (current or future device failure, damaged or improperly terminated cable, fixture compatibility issue, etc.), so devices should always be installed in locations where they will remain accessible during start-up as well as after the job is turned over to the customer 34 -* Label all JBOX devices and cables. ZUMNET-JBOX-* and ZUMLINK-JBOX-* devices are typically given labels on the submittals, and it is best practice to label installed devices with these labels and/or the controlled zone. Doing this helps to simplify any troubleshooting that is required during startup or after the job has been turned over 35 -* Record any changes made to cable routing during installation. Keeping track of as-built conditions is necessary in case any alterations end up necessitating changes to the program, as well as to simplify troubleshooting and maintenance 37 +Zūm Wired keypads (wall switches) mount using single-gang boxes. 38 + 39 +See product spec sheets or installation guides for details on how to mount specific devices. 40 + 41 +== Location == 42 + 43 +Lorem 44 + 45 +== Labelling Devices and Cables == 46 + 47 +Lorem 48 + 49 += Recording As-Built Conditions = 50 + 51 +Lorem 52 + 53 +== Serial Numbers == 54 + 55 +Lorem 56 + 57 +== Cable Routing == 58 + 59 +Lorem 36 36 )))