Changes for page **General Overview and Design Considerations
Last modified by Alexander Mott on 2023/12/08 18:37
From version 14.1
edited by Alexander Mott
on 2023/03/24 20:59
on 2023/03/24 20:59
Change comment:
There is no comment for this version
To version 14.2
edited by Alexander Mott
on 2023/03/27 18:58
on 2023/03/27 18:58
Change comment:
There is no comment for this version
Summary
-
Page properties (1 modified, 0 added, 0 removed)
Details
- Page properties
-
- Content
-
... ... @@ -110,7 +110,20 @@ 110 110 111 111 Lorem 112 112 113 -= De vice CountLimitations =113 += Hardware Design Limitations = 114 114 115 -Lorem 115 +There are a handful of limitations to keep in mind when designing Zūm Wired systems, with different restrictions applying to Zūm Net and Zūm Link: 116 + 117 +Zūm Net limitations: 118 + 119 +* Do not exceed 100m or 328' between subsequent ZUMNET-JBOX-* devices, or between the first ZUMNET-JBOX and the network switch 120 +* Do not exceed 20 ZUMNET-JBOX-* devices on a single run of Zūm Net 121 +* Do not "loop" Zūm Net cables (i.e., cables should start at the network switch and end at the last ZUMNET-JBOX, without a returning cable from the last device back to the switch) 122 + 123 +Zūm Link limitations: 124 + 125 +* Do not exceed 31 ZUMLINK-* and Cresnet devices on a single ZUMNET-JBOX-* device 126 +* Do not exceed 2 ZUMLINK-OCC-* sensors or non-system sensors per ZUMNET/ZUMLINK-JBOX-* room 127 +** Each ZUMNET/ZUMLINK-JBOX-* is limited to 24 V, 85 mA output shared across their Zūm Link ports and sensor inputs 128 +** Power is said to be additive between boxes, 116 116 )))